Catalent Staircase

The Harmans/BWI campus of Catalent Pharma Solutions aids in Gene Therapy clinical manufacturing and laboratory testing. With close to 200,000 square feet, there was room to expand into the second level of part of the facility, which created a need for an exterior staircase. This new elevated entrance allows for equipment and personnel to enter conveniently into the elevated portion of the workspace. With the elevated entrance being 22’ in height, and lacking considerable space to work with, a half landing staircase was necessary. Grating is used as the steps and platform, while square tubing is used as the grabrail.

These stairs will receive a lot of foot traffic and are externally exposed, therefore Hot-Dip Galvanizing was chosen as the preferred coating because it offers durability, corrosion protections, and has the best life-cycle cost. When asked if there was another coating that was considered, the project manager on the job said “No, hot-dip galvanizing provided the best corrosion protection and the most efficient cost, and no other coatings will be required.†The project owner is pleased that this staircase will last for years to come, with no harm or safety concerns to pedestrians.

Additional Projects

In 2018 SL Green, the property manager of One Madison Ave announced plans to redevelop the property.
One Madison

One Madison

Vantage Data Centers are part of the world’s largest data center market. Sitting on a campus of 52 acres, with 6 multi-story facilities, VA 13 has a property size of 364,600 sq. ft.
Vantage Data Center VA 13

Vantage Data Center VA 13

Once the dealership, the architect, Lepi / contractor came up with a finalized design, Precision Welding & Installation was selected as the fabricator for the project
American Pride Parking Garage

American Pride Parking Garage